Building reliable systems &
polished interfaces.
Amritraj Patra
Full Stack Developer · Golang · TypeScript · React · Next.js
Full Stack Developer with 3+ years of experience building scalable web applications, real-time telemetry systems, and modern cloud-ready solutions using Golang, TypeScript, React, and Next.js.
About me
Engineer focused on reliable systems and clean interfaces.
I'm a Full Stack Developer with 3+ years of experience building scalable web applications, real-time telemetry platforms, and cloud-ready services. My core strength is backend development in Golang, paired with strong frontend craft in React, Next.js and TypeScript.
I've built real-time telemetry systems for the power sector, working with MQTT, WebSockets, and the IEC 60870-5 protocol family to reliably transport high-frequency sensor data. I'm passionate about performance optimization, clean architecture, and AI-powered, cloud-native applications.
I care about the small things — readable code, observability, latency budgets — because they compound into systems that survive contact with reality.
Skills
A toolkit shaped by real-time systems and modern web.
Backend depth in Go, frontend craft in React, and the protocol glue that holds it all together.
Backend
- Golang 95%
- Node.js 85%
- REST APIs 92%
- WebSockets 90%
- MQTT 92%
- Microservices 85%
Frontend
- React 92%
- Next.js 90%
- TypeScript 92%
- JavaScript 95%
- Tailwind CSS 88%
- HTML / CSS 95%
Database
- PostgreSQL 88%
- MySQL 82%
- MongoDB 78%
DevOps & Tools
- Docker 85%
- Git / GitHub 92%
- Linux 88%
- CI/CD 80%
Protocols & Real-Time
- IEC 60870-5-101 90%
- IEC 60870-5-104 92%
- MQTT 92%
- TCP/IP 88%
Other
- System Design 88%
- Performance Optimization 88%
- Real-Time Monitoring 92%
- Cloud Fundamentals 80%
Experience
A timeline of real-time systems and the work behind them.
Full Stack Developer
Power Sector Monitoring · Odisha, India
Gateway Telemetry System
Designed a real-time telemetry platform that ingests high-frequency sensor data over IEC 60870-5-101/104 and MQTT, with backpressure-safe fan-out to consumers.
Real-Time Monitoring Dashboards
Built responsive dashboards with WebSocket-based live updates, virtualization, and a tight render budget for 10k+ concurrent points.
Scalable REST APIs
Designed and shipped REST APIs with auth, rate limiting, and observability — cutting P95 response times and improving reliability.
Featured work
Projects built for scale, speed, and clarity.
A small selection of systems I've designed, shipped, and kept running.
Numbers that add up to reliable systems.
Years spent building software that has to stay up.
Get in touch
Let's build something reliable.
Open to interesting full-time roles and select freelance work. Drop a note and I'll get back within a day.